Works with the Usage of Post-Tension System

29-09-2017

On September 25, construction works were completed on the installation of a reinforced concrete slab of the school's gymnasium ceiling panel at the address: Lomonosov Str. (microdistrict No. 1) in the Golosiivskyi district of Kyiv. The work was performed with the usage of a post-tension system. The area of the slab was 795 m2, the length of the span of the beam – near 24 m, the height to the slab – 11 m.

As the Customer acted L-Bud Company LLC. The work was carried out in a high-quality and timely manner, in full compliance with the terms of the contract and the norms of Ukrainian legislation.